P14-03: Record Runner formal completion; P14 package complete, units 22/88
Cite the real Runner receipts (submitteda5d2491, integrated/finalb7f6168, 9/9 conditions, low findings preserved) in a new ACCEPTANCE record. Keep the x1 budget miss, x3/stall/render/Windows, the unused staff service shaft and the four low findings as separate unmet items. Pinned p06-01/p14-02 acceptance JSON unchanged; the 46-suite supplement lives in the new record. Sync P28-01 summary and gaps to the r02 measurements; next unit P28-01. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5.5
parent
b7f6168dc8
commit
8c36c100b2
@@ -1,3 +1,22 @@
|
||||
## 現在の対象(2026-10-20・正式22成果/P14-03正式完了、P14パッケージ完了)
|
||||
|
||||
元30パッケージ・88成果単位で、部分点はありません。正式完了は22成果、完了パッケージは4(P00、P04、P06、P14)です。
|
||||
|
||||
**P14-03「混雑と経路選択」は Runner で正式完了しました。**
|
||||
- Runner の実receipt: 提出 `a5d2491`、統合・final `b7f6168`、main-base `e8b3dbe`。登録9条件すべて完了、high/medium/critical の指摘は0です。
|
||||
- 受入記録は `execution/p14-03-route-wait/ACCEPTANCE.json` です。条件表と、結合した証拠(正式全回帰192/192、Root別PID pair 5/5、代表性能r02、独立Opusレビュー PASS)を記載しています。
|
||||
- これで P14-01・02・03 の3成果がそろい、P14パッケージが完了しました。
|
||||
|
||||
**解消扱いしない別の未達**(P14の完了に含めません)
|
||||
- Runner review の low 4件
|
||||
- x1 1分tick は平均約827 msで、4 ms の予算に届いていません
|
||||
- x3 frame、stall、描画は未測定、Windows は未検証です
|
||||
- 代表負荷で、実際の職員が業務用shaftを使う場面は実施していません
|
||||
|
||||
**過去の回帰範囲の補足**: 46 suite の件は P14-03 の受入記録と各単位の訂正注記に残しました。p06-01・p14-02 の pinned ACCEPTANCE.json は改変していません。
|
||||
|
||||
**次の対象**: P28-01「現HEADの性能基準」です。現sourceの r02 実測(headless・Operations OFF・x1)を再利用し、windowed描画・x3・Operations ON と記録項目の不足分だけを埋めます。
|
||||
|
||||
## 現在の対象(2026-10-20・正式21成果/P14-03はRunnerゲート待ち)
|
||||
|
||||
元30パッケージ・88成果単位で、部分点はありません。正式完了は21成果、完了パッケージは3(P00、P04、P06)です。
|
||||
|
||||
Reference in New Issue
Block a user