P08-02: 旧配置の安全な変更

This commit is contained in:
Agent Control Runner
2026-10-13 21:39:16 +09:00
parent e59206b9b2
commit bb34f443c4
8 changed files with 166 additions and 17806 deletions
+13
View File
@@ -2,3 +2,16 @@
Controlled fixture inputs are diagnostic, not production balance values.
Native collection and acceptance remain pending.
Seed: 42588. Registered construction costs for the 16 planned builds total
gold 7110 / materials 88; Gina signing costs 150 and eight raw food units cost
24. Initial resources are gold 5000 / materials 50. The previous fixture had
no change_resources delta (zero), short by gold 2284 / materials 38.
The fixture derives and records this deficit from the actual registry/catalogs
in identity.diagnostic_budget before using the existing change_resources command.
No price or production coefficient is changed.
The first legacy premium job progresses while the six actor/transport facets
are prepared. The second is paid and reserved immediately before saving, with
zero progress; the dormitory is already complete. All three stages share the
same migration batch and whole-state writer/reader comparisons.