8 Commits
Author SHA1 Message Date
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00
Takeshi 4d72de8973 Record business policy acceptance, economy results, and recovery point 2026-09-09 12:06:29 +09:00
Takeshi 071e338e82 Record three-day supply acceptance and recovery checkpoint 2026-09-09 09:58:09 +09:00
Takeshi 627b200f00 Connect paid food purchasing, kitchen production, and porter deliveries 2026-09-09 09:46:33 +09:00
Codex 29a660aed0 Enable first operating day with staff assignments, opening guide, and ledger 2026-09-09 08:26:20 +09:00
Codex 423fd6dd2e Preserve approved pixel tower prototype as development baseline 2026-09-09 07:51:16 +09:00