4 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 a8edd3c3a1 P14-03: Versioned shaft-wait saves, keep riders aboard, real-actor proof
- ElevatorService snapshot v2 carries the shaft-wide wait; v1 saves (written
  with every elevator dynamic_cost 0) migrate by deriving it on load, and any
  v2 mismatch, including all zeros, is rejected atomically. A genuine save
  from 50ceca0 is kept as tests/fixtures/p14-03/legacy_rush_v1.
- A guest aboard a cabin no longer decides, leaves or despawns until the
  elevator sets it down at a real landing; previously a rider told to leave
  vanished from a moving cabin.
- test_route_wait_choice now proves the rush detour and route loss with a
  worker who actually walks, every shared rider's arrival cell, service
  elevator and stair congestion, legacy migration and a new-PID restart.
- Register completion markers for the seven suites added this session and
  bring the P14 ledger in line with P14-02's completion.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 16:51:41 +09:00
TakeshiandClaude Opus 5.5 0754f412a8 P14-03: Price whole-shaft elevator waits in A* route choice
Riders queued for any floor pair in a shaft now delay every pair: the
elevator service publishes the rest of the shaft queue as each connector's
dynamic cost, refreshed on trip changes and each cabin minute, and restore
rejects saves whose wait disagrees with their trips. A two-shaft fixture with
real guests shows rush diversion, shared cabins within capacity, recovery,
route loss and warp-exit congestion.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:57:28 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00