Commit Graph
3 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 0754f412a8 P14-03: Price whole-shaft elevator waits in A* route choice
Riders queued for any floor pair in a shaft now delay every pair: the
elevator service publishes the rest of the shaft queue as each connector's
dynamic cost, refreshed on trip changes and each cabin minute, and restore
rejects saves whose wait disagrees with their trips. A two-shaft fixture with
real guests shows rush diversion, shared cabins within capacity, recovery,
route loss and warp-exit congestion.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:57:28 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00