Commit Graph
10 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 0cfaec1626 P14-02: Add buildable Mana warp (A07)
2x2 FRONT warp at 3000G/30 materials/360 min, 15G/day and 1 Mana upkeep.
Every completed warp pair is linked by one path connector, so crossing is a
single step; a 3-Mana fare per rider is charged once in the step's tick.
Warps close while either end is unpowered, the reserve is empty or below one
fare, and blocked arrivals offer no step. Saves validate the derived links.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 10:45:28 +09:00
TakeshiandClaude Opus 5.5 ae0f998ff4 P06-01: Implement approved A06 finite Mana reserve (MP-01-r02 recommended)
Initial 100, capacity 300, world tree +20 per 10 game minutes. Each boundary
pays registered upkeep demand before storing surplus; overflow is discarded
and recorded, 0 stops the whole tower. Furnace offers are judged after
generation and demand payment. New saves carry mana_reserve and Operations
rollback includes it; legacy saves keep a 0..300 amount and reject others.

Outage tests that relied on Mana 0 persisting now hold the outage with a
disabled demand sink, since the world tree recovers at the next boundary.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 17:20:04 +09:00
Agent Control Runner 12f04d6e8b P08-03-RTPREVIEW: P08-03を閉じるための共有配置プレビュー判定 2026-10-14 19:49:04 +09:00
Agent Control Runner 8d52b20d40 P08-03-RTPREVIEW: P08-03を閉じるための共有配置プレビュー判定 2026-10-14 18:01:14 +09:00
Agent Control Runner 78dc82da07 P08-03-RTPREVIEW: P08-03を閉じるための共有配置プレビュー判定 2026-10-14 17:51:57 +09:00
Takeshi b84bade045 Save The Tree implementation and acceptance work in progress
Preserve production code, regression fixtures, audio assets and provenance, test infrastructure, and the original-completion plan and progress ledger. Final game and Windows acceptance remain pending; excluded local artifacts and native experiments are not part of this snapshot.
2026-10-11 15:58:00 +09:00
Takeshi 39f6068461 Add supply auto-purchase and preserve save recovery state 2026-10-02 07:35:03 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00