Takeshi and Claude Opus 5.5
8c36c100b2
P14-03: Record Runner formal completion; P14 package complete, units 22/88
...
Cite the real Runner receipts (submitted a5d2491 , integrated/final b7f6168 ,
9/9 conditions, low findings preserved) in a new ACCEPTANCE record. Keep the
x1 budget miss, x3/stall/render/Windows, the unused staff service shaft and
the four low findings as separate unmet items. Pinned p06-01/p14-02
acceptance JSON unchanged; the 46-suite supplement lives in the new record.
Sync P28-01 summary and gaps to the r02 measurements; next unit P28-01.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com >
2026-10-20 19:56:15 +09:00
Takeshi and Claude Opus 5.5
e8b3dbe7a4
P14-03: Record review PASS awaiting Runner gate; sync current status
...
- P14-03 on 83b170a : formal 192/192 (22,198 checks), Root pairs 5/5,
representative perf r02 (collection/functional comparison established;
x1 ~827 ms exceeds the 4 ms budget in both versions), independent Opus
whole-unit review PASS. Per the skill contract it stays uncounted (21/88)
until Runner's own validate/review/integration/final; the registration
proposal and evidence-binding verifier are under artifacts/.../p14-03-runner-gate-r01.
- Correction notes on P06-01/P06-03/P14-02/P06-02: their regressions missed 46
roster-only suites; the defects found there are fixed in 83b170a and the
formal 192-suite run covers them. Completions and approvals are preserved.
- IMPLEMENTATION_PLAN header and progress_snapshot next pointers now show 21
units, P14-03 at the Runner gate and P28-01 next; history kept.
- Evidence matrix: 50% slowdown attributed to test_runtime_path_traffic,
injected trips and budget/scope wording per the review.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com >
2026-10-20 19:18:54 +09:00
Takeshi
ed9d72a1c2
Record Opus-selected P06-02 audit under updated team
2026-10-19 01:05:30 +09:00
Takeshi
d9262a71f4
Record P04-01 formal acceptance and updated development workflow
2026-10-19 00:59:23 +09:00
Takeshi
32c8d1ce43
docs: formally close P23-03 with exact-version acceptance evidence
2026-10-17 00:20:38 +09:00
Takeshi
fe4289ed81
docs: record Opus scheduling and resume held P18 save-compatibility repair
2026-10-15 20:19:46 +09:00
Takeshi
679a9273c9
docs: formally close original P13-03 with reviewed integration evidence
2026-10-15 20:07:53 +09:00
Takeshi
32ca5b34c5
docs: preserve exact P23 regression and reviewed P13 closure candidate
2026-10-15 20:03:49 +09:00
Takeshi
57131ec616
docs: record frozen P23 full regression and reuse P04 order audit
2026-10-15 18:47:09 +09:00
Takeshi
50b2dbeba4
docs: preserve independent P23-03 finding and scoped Sol correction
2026-10-15 18:28:16 +09:00
Takeshi
92546af5b7
docs: record P23-03 submitted repair and exact native impact checks
2026-10-15 18:20:25 +09:00
Takeshi
bc0cf3a4a1
docs: retain R08 OS evidence and record corrected supply display candidate
2026-10-15 10:58:36 +09:00
Takeshi
71719f9186
docs: supply complete OS image evidence and reclaim ended import caches
2026-10-15 10:22:20 +09:00
Takeshi
27dec31228
docs: record passing P23 semantics and actual OS calibration diagnostic
2026-10-15 10:12:29 +09:00
Takeshi
7fae76c723
docs: record reproduced P23 native evidence and remaining semantic mismatch
2026-10-15 09:56:30 +09:00
Takeshi
5df2e56faa
docs: record actual P23 native and whole-cohort comparison evidence
2026-10-15 09:51:36 +09:00
Takeshi
4eaadd1c53
docs: preserve P23 implementation and focus Sol finalization
2026-10-15 09:34:44 +09:00
Takeshi
d7c5fadd39
docs: correct P23 rest authority and record continued implementation
2026-10-15 09:18:07 +09:00
Takeshi
451e0732c3
docs: record preserved P23-03 continuation and decoder feasibility
2026-10-15 09:14:12 +09:00
Takeshi
2c9603b8b0
Offload superseded evidence to verified Google Drive archives and reclaim local storage
2026-10-15 08:58:56 +09:00
Takeshi
91a044e4f2
Continue P23-03 collector implementation with Opus-directed Sol and record storage trial
2026-10-15 08:06:24 +09:00
Takeshi
cc72d70946
Preserve P23-03 initial implementation and continue exact unfinished work
2026-10-15 07:53:55 +09:00
Takeshi
729df14dae
Record P23-03 controlled Astra implementation start and exact acceptance scope
2026-10-15 07:41:59 +09:00
Takeshi
e01e04c62d
Start source-bound P23-03 acceptance audit after Opus sequencing decision
2026-10-15 07:36:46 +09:00
Takeshi
a2e739396b
Close P08-03 with all five reviewed acceptance conditions and final integration proof
2026-10-15 07:34:44 +09:00
Takeshi
a025d77684
Record P08-03 exact native OS review proof and lossless storage recovery
2026-10-15 07:33:08 +09:00
Takeshi
7564423c85
docs: record repair20 local native and current-proof routing checks
2026-10-15 00:43:57 +09:00
Takeshi
7e66b6c753
docs: pin fresh-proof routing defect and repair20 direction
2026-10-15 00:28:52 +09:00
Takeshi
3c65c71494
docs: record P08-03 repair19 local and native verification
2026-10-15 00:19:36 +09:00
Takeshi
96c17719cc
docs: correct P08-03 R15 evidence and current acceptance gaps
2026-10-15 00:03:32 +09:00
Takeshi
0172e523f7
docs: pin P08 frozen full regression and truthful OS continuation
2026-10-14 23:19:52 +09:00
Takeshi
127f22fa1e
Close shared Runtime support with exact-version integration evidence
2026-10-14 20:18:49 +09:00
Takeshi
f7e189c7e4
Verify shared Runtime proof and independent review before integration
2026-10-14 20:06:57 +09:00
Takeshi
ed3ee23709
Start Opus-directed shared Runtime support without adding delivery units
2026-10-14 17:48:33 +09:00
Takeshi
b7e706e798
Verify existing asset publisher provenance and preserve completed worktrees
2026-10-13 17:43:33 +09:00
Takeshi
d2a1f80a61
Define P18 original relationship preservation code contract
2026-10-13 14:02:05 +09:00
Takeshi
b84c3499d1
docs: formally close P24-03 with reviewed integration and final evidence
2026-10-13 09:41:59 +09:00
Takeshi
8001b11558
docs: resume authorized P24 closure without redundant approval wait
2026-10-13 09:08:06 +09:00
Takeshi
1f6c46d9f5
docs: start original P13-03 and preserve spec hash repair evidence
2026-10-13 03:33:42 +09:00
Takeshi
25467ac502
docs: record P24 exact-candidate validation and review proposal
2026-10-13 02:29:39 +09:00
Takeshi
74fc69698a
docs: record managed Claude decision and P06-01 audit dispatch
2026-10-12 23:45:56 +09:00
Takeshi
02d047c72a
docs: reorder acceptance work and prepare managed AI handoff
2026-10-12 23:27:58 +09:00
Takeshi
2a53dbb596
Record current guest projection cost and whole-state evidence
2026-10-12 15:46:06 +09:00
Takeshi
381083dcaf
Preserve whole-state comparison and current performance disposition
2026-10-12 15:14:16 +09:00
Takeshi
8b6e515dbf
Preserve repaired validation capture candidate and reviewed local evidence
2026-10-12 14:51:08 +09:00
Takeshi
6a709be988
Preserve reviewed current phase diagnostic and correct P23-02 bottleneck scope
2026-10-12 14:14:42 +09:00
Takeshi
ce36e98dde
Preserve reviewed input-copy candidate and reconcile P23-02 acceptance ledger
2026-10-12 13:48:14 +09:00
Takeshi
0cbe2641ff
Verify native Guest batch local and full snapshot equivalence with reviewed evidence
2026-10-12 12:05:56 +09:00
Takeshi
f710119423
Implement isolated native Guest candidate batch and preserve reviewed host build evidence
2026-10-12 11:13:51 +09:00
Takeshi
c8b730e6a2
Preserve current native residual diagnostic and reviewed Guest work contract
2026-10-12 10:42:26 +09:00