 TakeshiandClaude Opus 5.5
|
7e6e540837
|
P06-03: Record owner approval; original units 19/88
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
|
2026-10-20 10:03:53 +09:00 |
|
 TakeshiandClaude Opus 5.5
|
db5ca62e42
|
P06-01: Record owner approval; original units 18/88
Owner approved P06-01 formal completion on candidate f247d19 (2026-10-20).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
|
2026-10-20 08:57:41 +09:00 |
|
Takeshi
|
bf74684976
|
Record P06 audit closure and live Claude Desktop controller handoff
|
2026-10-19 13:36:07 +09:00 |
|
Takeshi
|
6784ea5f08
|
Preserve validated adapter candidate and exact Opus review resume
|
2026-10-19 01:44:37 +09:00 |
|
Takeshi
|
edcb20d3d1
|
Track retained P06 audit and narrow adapter correction
|
2026-10-19 01:31:16 +09:00 |
|
Takeshi
|
174494613a
|
Record P06 audit continuation and confirmed quota fallback
|
2026-10-19 01:10:02 +09:00 |
|
Takeshi
|
ed9d72a1c2
|
Record Opus-selected P06-02 audit under updated team
|
2026-10-19 01:05:30 +09:00 |
|
Takeshi
|
d9262a71f4
|
Record P04-01 formal acceptance and updated development workflow
|
2026-10-19 00:59:23 +09:00 |
|
Takeshi
|
c0ea009b28
|
docs: formally close original P26 content ledger at 16 of 88
|
2026-10-18 10:02:26 +09:00 |
|
Takeshi
|
fc9c8909ac
|
docs: record original P26 whole-review pass before normal integration
|
2026-10-18 09:51:11 +09:00 |
|
Takeshi
|
a65af90168
|
docs: record direct Opus source judgment and exact P26 attribution repair
|
2026-10-18 09:41:08 +09:00 |
|
Takeshi
|
aec0957b98
|
docs: bind targeted Astra repair and verified Drive evidence offload
|
2026-10-18 09:22:35 +09:00 |
|
Takeshi
|
2d506a5ce8
|
docs: bind repaired P26 validation and live whole-unit review
|
2026-10-18 09:17:08 +09:00 |
|
Takeshi
|
3b9e8f32bd
|
docs: record verified complete approval delivery and same P26 repair
|
2026-10-18 09:08:03 +09:00 |
|
Takeshi
|
e6327b4571
|
docs: bind P26 review repair to actual runner and retain exact evidence
|
2026-10-18 09:03:14 +09:00 |
|
Takeshi
|
a13f7c0b79
|
docs: record actual D05 approvals and P26 whole-review repairs
|
2026-10-18 09:02:00 +09:00 |
|
Takeshi
|
e6fb757480
|
docs: record corrected P26 new-output direction and same managed run
|
2026-10-17 20:44:25 +09:00 |
|
Takeshi
|
27d0a3c764
|
docs: record same-task P26 input recovery and live worker
|
2026-10-17 20:40:15 +09:00 |
|
Takeshi
|
f525629ab7
|
docs: align active work and actual P26 managed worker state
|
2026-10-17 20:37:11 +09:00 |
|
Takeshi
|
6396321a4d
|
docs: start original P26 ledger audit and record verified storage recovery
|
2026-10-17 20:36:24 +09:00 |
|
Takeshi
|
f4f85bc54c
|
docs: formally close original P19 reachability acceptance at 15 of 88
|
2026-10-17 20:29:40 +09:00 |
|
Takeshi
|
e7acd530c5
|
docs: record P19 definition-integrity repair and real main preflight
|
2026-10-17 20:20:46 +09:00 |
|
Takeshi
|
6e17cae5c9
|
docs: pin full P19 reachability review pass before normal integration
|
2026-10-17 19:58:25 +09:00 |
|
Takeshi
|
b81f9f2860
|
docs: retain P19 whole-review findings and same-task repair status
|
2026-10-17 19:50:02 +09:00 |
|
Takeshi
|
c5e2087dde
|
docs: record P19 validated submission and verified checkout recovery
|
2026-10-17 19:39:40 +09:00 |
|
Takeshi
|
8ca9263fee
|
docs: register Opus-selected original P19 reachability audit scope
|
2026-10-17 19:16:06 +09:00 |
|
Takeshi
|
1b07b87d37
|
docs: close reviewed P13 backend batch through normal final integration
|
2026-10-17 19:05:58 +09:00 |
|
Takeshi
|
191ea3b4d1
|
docs: record qualified P13 full regression and active independent review
|
2026-10-17 19:01:05 +09:00 |
|
Takeshi
|
ef96967d8a
|
docs: record exact P13 native local validation and current original-unit state
|
2026-10-17 17:28:47 +09:00 |
|
Takeshi
|
c80c1688fa
|
docs: record P24 repair6 reviewed and native readiness
|
2026-10-17 15:21:02 +09:00 |
|
Takeshi
|
54cade4181
|
docs: record P24-02 repair4 source readiness and independent static review
|
2026-10-17 14:22:41 +09:00 |
|
Takeshi
|
51e8657bfb
|
docs: record Opus P24-02 continuation and audit retained evidence
|
2026-10-17 00:27:23 +09:00 |
|
Takeshi
|
32c8d1ce43
|
docs: formally close P23-03 with exact-version acceptance evidence
|
2026-10-17 00:20:38 +09:00 |
|
Takeshi
|
afde233203
|
Archive cold evidence on Drive and preserve current acceptance pins
|
2026-10-15 22:10:37 +09:00 |
|
Takeshi
|
1a6cc43f2e
|
docs: preserve P18 native evidence, review findings and scoped repair continuation
|
2026-10-15 21:09:14 +09:00 |
|
Takeshi
|
fe4289ed81
|
docs: record Opus scheduling and resume held P18 save-compatibility repair
|
2026-10-15 20:19:46 +09:00 |
|
Takeshi
|
679a9273c9
|
docs: formally close original P13-03 with reviewed integration evidence
|
2026-10-15 20:07:53 +09:00 |
|
Takeshi
|
32ca5b34c5
|
docs: preserve exact P23 regression and reviewed P13 closure candidate
|
2026-10-15 20:03:49 +09:00 |
|
Takeshi
|
57131ec616
|
docs: record frozen P23 full regression and reuse P04 order audit
|
2026-10-15 18:47:09 +09:00 |
|
Takeshi
|
50b2dbeba4
|
docs: preserve independent P23-03 finding and scoped Sol correction
|
2026-10-15 18:28:16 +09:00 |
|
Takeshi
|
92546af5b7
|
docs: record P23-03 submitted repair and exact native impact checks
|
2026-10-15 18:20:25 +09:00 |
|
Takeshi
|
3379e283e4
|
Preserve P23 geometry implementation and source-grounded continuation decisions
|
2026-10-15 17:30:11 +09:00 |
|
Takeshi
|
74228df24b
|
Preserve actual R13 visual defects and dispatch Opus-directed Astra repair
|
2026-10-15 16:32:03 +09:00 |
|
Takeshi
|
a44eca6414
|
Record R13 mechanical evidence and managed serial visual review continuation
|
2026-10-15 16:14:24 +09:00 |
|
Takeshi
|
990a951e36
|
Archive ended P23 execution copies and reconcile storage evidence
|
2026-10-15 13:51:09 +09:00 |
|
Takeshi
|
d1ac5ba065
|
docs: preserve R11 evidence and prepare verified Root load point capture
|
2026-10-15 13:19:50 +09:00 |
|
Takeshi
|
f135814b8b
|
docs: track submitted diagnostic budget repair and retain old native proof in Drive
|
2026-10-15 12:31:48 +09:00 |
|
Takeshi
|
9dbfa36b86
|
docs: retain R10 fixture findings and verified closed proof cloud archive
|
2026-10-15 12:08:32 +09:00 |
|
Takeshi
|
127f22fa1e
|
Close shared Runtime support with exact-version integration evidence
|
2026-10-14 20:18:49 +09:00 |
|
Takeshi
|
f7e189c7e4
|
Verify shared Runtime proof and independent review before integration
|
2026-10-14 20:06:57 +09:00 |
|