TakeshiandClaude Opus 5.5 e8b3dbe7a4 P14-03: Record review PASS awaiting Runner gate; sync current status
- P14-03 on 83b170a: formal 192/192 (22,198 checks), Root pairs 5/5,
  representative perf r02 (collection/functional comparison established;
  x1 ~827 ms exceeds the 4 ms budget in both versions), independent Opus
  whole-unit review PASS. Per the skill contract it stays uncounted (21/88)
  until Runner's own validate/review/integration/final; the registration
  proposal and evidence-binding verifier are under artifacts/.../p14-03-runner-gate-r01.
- Correction notes on P06-01/P06-03/P14-02/P06-02: their regressions missed 46
  roster-only suites; the defects found there are fixed in 83b170a and the
  formal 192-suite run covers them. Completions and approvals are preserved.
- IMPLEMENTATION_PLAN header and progress_snapshot next pointers now show 21
  units, P14-03 at the Runner gate and P28-01 next; history kept.
- Evidence matrix: 50% slowdown attributed to test_runtime_path_traffic,
  injected trips and budget/scope wording per the review.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 19:18:54 +09:00
TakeshiandClaude Opus 5.5 a8edd3c3a1 P14-03: Versioned shaft-wait saves, keep riders aboard, real-actor proof
- ElevatorService snapshot v2 carries the shaft-wide wait; v1 saves (written
  with every elevator dynamic_cost 0) migrate by deriving it on load, and any
  v2 mismatch, including all zeros, is rejected atomically. A genuine save
  from 50ceca0 is kept as tests/fixtures/p14-03/legacy_rush_v1.
- A guest aboard a cabin no longer decides, leaves or despawns until the
  elevator sets it down at a real landing; previously a rider told to leave
  vanished from a moving cabin.
- test_route_wait_choice now proves the rush detour and route loss with a
  worker who actually walks, every shared rider's arrival cell, service
  elevator and stair congestion, legacy migration and a new-PID restart.
- Register completion markers for the seven suites added this session and
  bring the P14 ledger in line with P14-02's completion.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 16:51:41 +09:00
TakeshiandClaude Opus 5.5 50ceca0b7d P06-02: Record completion under delegated approval; P06 package complete, units 21/88
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:48:47 +09:00
TakeshiandClaude Opus 5.5 28e3ffe146 P14-02: Record completion under delegated approval; original units 20/88
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:11:52 +09:00
TakeshiandClaude Opus 5.5 7e6e540837 P06-03: Record owner approval; original units 19/88
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 10:03:53 +09:00
TakeshiandClaude Opus 5.5 db5ca62e42 P06-01: Record owner approval; original units 18/88
Owner approved P06-01 formal completion on candidate f247d19 (2026-10-20).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 08:57:41 +09:00
Takeshi bf74684976 Record P06 audit closure and live Claude Desktop controller handoff 2026-10-19 13:36:07 +09:00
Takeshi 6784ea5f08 Preserve validated adapter candidate and exact Opus review resume 2026-10-19 01:44:37 +09:00
Takeshi edcb20d3d1 Track retained P06 audit and narrow adapter correction 2026-10-19 01:31:16 +09:00
Takeshi 174494613a Record P06 audit continuation and confirmed quota fallback 2026-10-19 01:10:02 +09:00
Takeshi ed9d72a1c2 Record Opus-selected P06-02 audit under updated team 2026-10-19 01:05:30 +09:00
Takeshi d9262a71f4 Record P04-01 formal acceptance and updated development workflow 2026-10-19 00:59:23 +09:00
Takeshi c0ea009b28 docs: formally close original P26 content ledger at 16 of 88 2026-10-18 10:02:26 +09:00
Takeshi fc9c8909ac docs: record original P26 whole-review pass before normal integration 2026-10-18 09:51:11 +09:00
Takeshi a65af90168 docs: record direct Opus source judgment and exact P26 attribution repair 2026-10-18 09:41:08 +09:00
Takeshi aec0957b98 docs: bind targeted Astra repair and verified Drive evidence offload 2026-10-18 09:22:35 +09:00
Takeshi 2d506a5ce8 docs: bind repaired P26 validation and live whole-unit review 2026-10-18 09:17:08 +09:00
Takeshi 3b9e8f32bd docs: record verified complete approval delivery and same P26 repair 2026-10-18 09:08:03 +09:00
Takeshi e6327b4571 docs: bind P26 review repair to actual runner and retain exact evidence 2026-10-18 09:03:14 +09:00
Takeshi a13f7c0b79 docs: record actual D05 approvals and P26 whole-review repairs 2026-10-18 09:02:00 +09:00
Takeshi e6fb757480 docs: record corrected P26 new-output direction and same managed run 2026-10-17 20:44:25 +09:00
Takeshi 27d0a3c764 docs: record same-task P26 input recovery and live worker 2026-10-17 20:40:15 +09:00
Takeshi f525629ab7 docs: align active work and actual P26 managed worker state 2026-10-17 20:37:11 +09:00
Takeshi 6396321a4d docs: start original P26 ledger audit and record verified storage recovery 2026-10-17 20:36:24 +09:00
Takeshi f4f85bc54c docs: formally close original P19 reachability acceptance at 15 of 88 2026-10-17 20:29:40 +09:00
Takeshi e7acd530c5 docs: record P19 definition-integrity repair and real main preflight 2026-10-17 20:20:46 +09:00
Takeshi 6e17cae5c9 docs: pin full P19 reachability review pass before normal integration 2026-10-17 19:58:25 +09:00
Takeshi b81f9f2860 docs: retain P19 whole-review findings and same-task repair status 2026-10-17 19:50:02 +09:00
Takeshi c5e2087dde docs: record P19 validated submission and verified checkout recovery 2026-10-17 19:39:40 +09:00
Takeshi 8ca9263fee docs: register Opus-selected original P19 reachability audit scope 2026-10-17 19:16:06 +09:00
Takeshi 1b07b87d37 docs: close reviewed P13 backend batch through normal final integration 2026-10-17 19:05:58 +09:00
Takeshi 191ea3b4d1 docs: record qualified P13 full regression and active independent review 2026-10-17 19:01:05 +09:00
Takeshi ef96967d8a docs: record exact P13 native local validation and current original-unit state 2026-10-17 17:28:47 +09:00
Takeshi c80c1688fa docs: record P24 repair6 reviewed and native readiness 2026-10-17 15:21:02 +09:00
Takeshi 54cade4181 docs: record P24-02 repair4 source readiness and independent static review 2026-10-17 14:22:41 +09:00
Takeshi 51e8657bfb docs: record Opus P24-02 continuation and audit retained evidence 2026-10-17 00:27:23 +09:00
Takeshi 32c8d1ce43 docs: formally close P23-03 with exact-version acceptance evidence 2026-10-17 00:20:38 +09:00
Takeshi afde233203 Archive cold evidence on Drive and preserve current acceptance pins 2026-10-15 22:10:37 +09:00
Takeshi 1a6cc43f2e docs: preserve P18 native evidence, review findings and scoped repair continuation 2026-10-15 21:09:14 +09:00
Takeshi fe4289ed81 docs: record Opus scheduling and resume held P18 save-compatibility repair 2026-10-15 20:19:46 +09:00
Takeshi 679a9273c9 docs: formally close original P13-03 with reviewed integration evidence 2026-10-15 20:07:53 +09:00
Takeshi 32ca5b34c5 docs: preserve exact P23 regression and reviewed P13 closure candidate 2026-10-15 20:03:49 +09:00
Takeshi 57131ec616 docs: record frozen P23 full regression and reuse P04 order audit 2026-10-15 18:47:09 +09:00
Takeshi 50b2dbeba4 docs: preserve independent P23-03 finding and scoped Sol correction 2026-10-15 18:28:16 +09:00
Takeshi 92546af5b7 docs: record P23-03 submitted repair and exact native impact checks 2026-10-15 18:20:25 +09:00
Takeshi 3379e283e4 Preserve P23 geometry implementation and source-grounded continuation decisions 2026-10-15 17:30:11 +09:00
Takeshi 74228df24b Preserve actual R13 visual defects and dispatch Opus-directed Astra repair 2026-10-15 16:32:03 +09:00
Takeshi a44eca6414 Record R13 mechanical evidence and managed serial visual review continuation 2026-10-15 16:14:24 +09:00
Takeshi 990a951e36 Archive ended P23 execution copies and reconcile storage evidence 2026-10-15 13:51:09 +09:00
Takeshi d1ac5ba065 docs: preserve R11 evidence and prepare verified Root load point capture 2026-10-15 13:19:50 +09:00