Commit Graph
10 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 0754f412a8 P14-03: Price whole-shaft elevator waits in A* route choice
Riders queued for any floor pair in a shaft now delay every pair: the
elevator service publishes the rest of the shaft queue as each connector's
dynamic cost, refreshed on trip changes and each cabin minute, and restore
rejects saves whose wait disagrees with their trips. A two-shaft fixture with
real guests shows rush diversion, shared cabins within capacity, recovery,
route loss and warp-exit congestion.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:57:28 +09:00
TakeshiandClaude Opus 5.5 0f23d34e9f Path: Apply "!id" access to layer-crossing and no-route diagnostics
A stopped guest warp now reports CONNECTOR_UNAVAILABLE instead of
GOAL_UNREACHABLE (P14-02 review r2 follow-up).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:12:47 +09:00
TakeshiandClaude Opus 5.5 8917c190cf P14-02: Split warps into guest FRONT and staff BACK service warp (A08)
The FRONT Mana warp is guest-only: its connectors carry the "!staff" access,
which path access checks treat as open to everyone except staff. A new 2x2
BACK service warp links only to other service warps for staff, with A07
values. Registry and palette now hold 25 definitions.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 13:48:14 +09:00
TakeshiandClaude Opus 5.5 0cfaec1626 P14-02: Add buildable Mana warp (A07)
2x2 FRONT warp at 3000G/30 materials/360 min, 15G/day and 1 Mana upkeep.
Every completed warp pair is linked by one path connector, so crossing is a
single step; a 3-Mana fare per rider is charged once in the step's tick.
Warps close while either end is unpowered, the reserve is empty or below one
fare, and blocked arrivals offer no step. Saves validate the derived links.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 10:45:28 +09:00
Takeshi b84bade045 Save The Tree implementation and acceptance work in progress
Preserve production code, regression fixtures, audio assets and provenance, test infrastructure, and the original-completion plan and progress ledger. Final game and Windows acceptance remain pending; excluded local artifacts and native experiments are not part of this snapshot.
2026-10-11 15:58:00 +09:00
Takeshi 39f6068461 Add supply auto-purchase and preserve save recovery state 2026-10-02 07:35:03 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00
Codex 423fd6dd2e Preserve approved pixel tower prototype as development baseline 2026-09-09 07:51:16 +09:00