Commit Graph
13 Commits
Author SHA1 Message Date
Agent Control Runner fd643f55a2 P08-03: 配置の通常操作受入 2026-10-14 20:45:46 +09:00
Agent Control Runner 47750010b8 P08-03: 配置の通常操作受入 2026-10-14 16:08:32 +09:00
Agent Control Runner 4f3b42dfec P08-03: 配置の通常操作受入 2026-10-14 07:49:56 +09:00
Agent Control Runner 7dd450c64c P08-03: 配置の通常操作受入 2026-10-14 03:22:38 +09:00
Agent Control Runner 9c711860a8 P24-03: 選択と保存の受入 2026-10-13 00:57:32 +09:00
Takeshi b84bade045 Save The Tree implementation and acceptance work in progress
Preserve production code, regression fixtures, audio assets and provenance, test infrastructure, and the original-completion plan and progress ledger. Final game and Windows acceptance remain pending; excluded local artifacts and native experiments are not part of this snapshot.
2026-10-11 15:58:00 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00
Takeshi b3b82ef03e Add business pricing and closure controls with compatible digest optimization 2026-09-09 12:04:12 +09:00
Takeshi 627b200f00 Connect paid food purchasing, kitchen production, and porter deliveries 2026-09-09 09:46:33 +09:00
Codex 29a660aed0 Enable first operating day with staff assignments, opening guide, and ledger 2026-09-09 08:26:20 +09:00
Codex 423fd6dd2e Preserve approved pixel tower prototype as development baseline 2026-09-09 07:51:16 +09:00