P05-02 (all expense categories and front/back funds) is formally completed:
S 8954914 -> Q cb183fd (same tree), Runner completed 8/8 with validation,
review, integration and final passed, and a separate fresh Opus PASS for
F1-F8 (high/medium 0, low 3). Measurements were taken on S; Q was
re-verified by content and is not relabelled as measured. Original
completion moves from 23 to 24 of 88; packages stay 4 of 30.
Still open: the P05 package (P05-03), ordinary-play back_gold (P09/P11
remaining_paid_role), two UI lows deferred under the feature-first
instruction, severance, Windows and whole-game acceptance. Earlier
failures and changes_requested reviews are kept.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
P28-02-EQ (support task) completed through the normal Runner flow:
S 9adbbee -> Q 4e34e52 on main 54e07ca. Exact-S native 7 phases,
formal unit 179 and native-verify, fresh independent Opus review of all
6 conditions (pass, low 2), normal integration and final, joined with
the actual Runner DB and traceability. The earlier changes_requested
(a46418d, EQ5) and the b2dbda8/6f75c9a failures stay preserved.
Original P28-02 remains in progress; 23/88 and 4/30 unchanged.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Cite the real Runner receipts (submitted a5d2491, integrated/final b7f6168,
9/9 conditions, low findings preserved) in a new ACCEPTANCE record. Keep the
x1 budget miss, x3/stall/render/Windows, the unused staff service shaft and
the four low findings as separate unmet items. Pinned p06-01/p14-02
acceptance JSON unchanged; the 46-suite supplement lives in the new record.
Sync P28-01 summary and gaps to the r02 measurements; next unit P28-01.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- P14-03 on 83b170a: formal 192/192 (22,198 checks), Root pairs 5/5,
representative perf r02 (collection/functional comparison established;
x1 ~827 ms exceeds the 4 ms budget in both versions), independent Opus
whole-unit review PASS. Per the skill contract it stays uncounted (21/88)
until Runner's own validate/review/integration/final; the registration
proposal and evidence-binding verifier are under artifacts/.../p14-03-runner-gate-r01.
- Correction notes on P06-01/P06-03/P14-02/P06-02: their regressions missed 46
roster-only suites; the defects found there are fixed in 83b170a and the
formal 192-suite run covers them. Completions and approvals are preserved.
- IMPLEMENTATION_PLAN header and progress_snapshot next pointers now show 21
units, P14-03 at the Runner gate and P28-01 next; history kept.
- Evidence matrix: 50% slowdown attributed to test_runtime_path_traffic,
injected trips and budget/scope wording per the review.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- ElevatorService snapshot v2 carries the shaft-wide wait; v1 saves (written
with every elevator dynamic_cost 0) migrate by deriving it on load, and any
v2 mismatch, including all zeros, is rejected atomically. A genuine save
from 50ceca0 is kept as tests/fixtures/p14-03/legacy_rush_v1.
- A guest aboard a cabin no longer decides, leaves or despawns until the
elevator sets it down at a real landing; previously a rider told to leave
vanished from a moving cabin.
- test_route_wait_choice now proves the rush detour and route loss with a
worker who actually walks, every shared rider's arrival cell, service
elevator and stair congestion, legacy migration and a new-PID restart.
- Register completion markers for the seven suites added this session and
bring the P14 ledger in line with P14-02's completion.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>