P07-01-WX (natural weather, rain arrivals and stay, storm, world tree
and adult fog effects, HUD forecast, save and migration) passed all
four normal gates: validation, review, integration and final. A fresh
separate Opus review passed WX1-WX8 with no high or medium finding and
two lows. S db87270 -> Q 9b5b09b with the same tree; the measurements
are on S.
Original credit is 0, so the count stays 24/88 and 4/30. Original
P07-01 moves from planned to in_progress. The furnace yield 120 at fog
boundaries and AR.weather.fog_magic remain, waiting for the P13 furnace
facility, D04 and the A06 separate approval. The event-log name of the
weather event and the two review lows are disclosed. Earlier failures
and changes_requested reviews are kept.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
P05-02 (all expense categories and front/back funds) is formally completed:
S 8954914 -> Q cb183fd (same tree), Runner completed 8/8 with validation,
review, integration and final passed, and a separate fresh Opus PASS for
F1-F8 (high/medium 0, low 3). Measurements were taken on S; Q was
re-verified by content and is not relabelled as measured. Original
completion moves from 23 to 24 of 88; packages stay 4 of 30.
Still open: the P05 package (P05-03), ordinary-play back_gold (P09/P11
remaining_paid_role), two UI lows deferred under the feature-first
instruction, severance, Windows and whole-game acceptance. Earlier
failures and changes_requested reviews are kept.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The r03 S f651ce1 failed its formal OPT verification: the save sample of the migration
attempt of a rejected out_of_range load stays in K. r04 extends decision D1 to that sample,
adds only that statement to the SPEC section 2 sites and derives the fixed table again from
the before record only. Docs only; the r03 task keeps its failure.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Docs only. Adds execution/p28-02/opt/: SPEC.md, TASK_INSTRUCTIONS.md and
registration/ (acceptance baseline of 12, registration and config
proposals, the before-derived fixed table of allowed cross-version
differences, and the byte-transfer record). Decision D1 is option B:
only the load_from_path failure path stops recording its performance
telemetry; the frozen E3 rule stays. The improvement rule is the formally
completed EQ SPEC §4. No product, frozen EQ or original-condition change;
23/88 and 4/30 unchanged. Registration is Root's; implementation is Opus.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
P28-02-EQ (support task) completed through the normal Runner flow:
S 9adbbee -> Q 4e34e52 on main 54e07ca. Exact-S native 7 phases,
formal unit 179 and native-verify, fresh independent Opus review of all
6 conditions (pass, low 2), normal integration and final, joined with
the actual Runner DB and traceability. The earlier changes_requested
(a46418d, EQ5) and the b2dbda8/6f75c9a failures stay preserved.
Original P28-02 remains in progress; 23/88 and 4/30 unchanged.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>