P16-01-DISMISS (dismissal of a general employee by the ordinary
command and the Main staff panel, with the A14 severance, held unpaid
wages, refusals R1-R9 and the cleanup at the command boundary) passed
all four normal gates: validation, review, integration and final. A
fresh separate Opus review passed F1-F10 with no high or medium
finding and five lows. S f5fe219 -> Q 4ca3bbe with the same tree; the
measurements are on S.
Original credit is 0, so the count stays 24/88 and 4/30. Original
P16-01 moves from planned to in_progress; recruitment, market and debt
acquisition and the cost per employment category remain. P16-03 stays
planned with a note. The P05 residual on the dismissal severance is
restated (A14 answered, connected, not counted as P05 completion).
The five review lows, the R9 boundary, the kept record gaps and the
Windows device acceptance are disclosed. Earlier failures and
changes_requested reviews are kept. IMPLEMENTATION_PLAN gains the
current 24-unit, feature-first section above the kept history.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Cite the real Runner receipts (submitted a5d2491, integrated/final b7f6168,
9/9 conditions, low findings preserved) in a new ACCEPTANCE record. Keep the
x1 budget miss, x3/stall/render/Windows, the unused staff service shaft and
the four low findings as separate unmet items. Pinned p06-01/p14-02
acceptance JSON unchanged; the 46-suite supplement lives in the new record.
Sync P28-01 summary and gaps to the r02 measurements; next unit P28-01.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- P14-03 on 83b170a: formal 192/192 (22,198 checks), Root pairs 5/5,
representative perf r02 (collection/functional comparison established;
x1 ~827 ms exceeds the 4 ms budget in both versions), independent Opus
whole-unit review PASS. Per the skill contract it stays uncounted (21/88)
until Runner's own validate/review/integration/final; the registration
proposal and evidence-binding verifier are under artifacts/.../p14-03-runner-gate-r01.
- Correction notes on P06-01/P06-03/P14-02/P06-02: their regressions missed 46
roster-only suites; the defects found there are fixed in 83b170a and the
formal 192-suite run covers them. Completions and approvals are preserved.
- IMPLEMENTATION_PLAN header and progress_snapshot next pointers now show 21
units, P14-03 at the Runner gate and P28-01 next; history kept.
- Evidence matrix: 50% slowdown attributed to test_runtime_path_traffic,
injected trips and budget/scope wording per the review.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>