Commit Graph
7 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 83b170a4c7 Fix regressions in roster-only suites from A06/A07/P14-03
The formal collector's roster includes 46 suites the Makefile never ran;
the first formal attempt stopped on test_required_kitchen and a sweep found:
- v15 MIMI purchase saves could not be written once Runtime saves carried
  mana_reserve (P06-01): the format detector now validates that section and
  excludes it before the unchanged v15 allowlist, like special_peeping_rooms.
- test_required_kitchen's legacy14 exact-load comparison now maps the two
  approved migrations (fresh A06 reserve at the restored boundary, elevator
  snapshot v1->v2) after checking each against its contract, in Runtime key
  order; every other byte must still match.
- test_runtime_defense_autonomy allowed Mana to change only by the A06 flow.
- test_p08_normal_placement_ops expects 25 palette slots (two warps); its
  suite-policy pin is updated with flags unchanged.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 17:08:40 +09:00
Takeshi 39f6068461 Add supply auto-purchase and preserve save recovery state 2026-10-02 07:35:03 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00
Takeshi 627b200f00 Connect paid food purchasing, kitchen production, and porter deliveries 2026-09-09 09:46:33 +09:00
Codex 423fd6dd2e Preserve approved pixel tower prototype as development baseline 2026-09-09 07:51:16 +09:00