Files
TheTree_mock/docs
Claude Opus 5.5 (Desktop) 48d3b0023b Complete original P05-02 acceptance and keep P05 residuals open
P05-02 (all expense categories and front/back funds) is formally completed:
S 8954914 -> Q cb183fd (same tree), Runner completed 8/8 with validation,
review, integration and final passed, and a separate fresh Opus PASS for
F1-F8 (high/medium 0, low 3). Measurements were taken on S; Q was
re-verified by content and is not relabelled as measured. Original
completion moves from 23 to 24 of 88; packages stay 4 of 30.

Still open: the P05 package (P05-03), ordinary-play back_gold (P09/P11
remaining_paid_role), two UI lows deferred under the feature-first
instruction, severance, Windows and whole-game acceptance. Earlier
failures and changes_requested reviews are kept.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-23 22:52:34 +09:00
..