Commit Graph
16 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 f6f9c9c0d4 P06-02: Prove whole-tower stop under natural A06 depletion across PIDs
An ordinary operating tower whose upkeep exceeds the world tree's supply runs
dry on its own; for an hour every facility is stopped with no sales, income,
production, admissions, warp travel or elevator boarding, and no guest is lost
except through ordinary departure. A mid-outage save continues identically in
a new process.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 15:18:38 +09:00
TakeshiandClaude Opus 5.5 0cfaec1626 P14-02: Add buildable Mana warp (A07)
2x2 FRONT warp at 3000G/30 materials/360 min, 15G/day and 1 Mana upkeep.
Every completed warp pair is linked by one path connector, so crossing is a
single step; a 3-Mana fare per rider is charged once in the step's tick.
Warps close while either end is unpowered, the reserve is empty or below one
fare, and blocked arrivals offer no step. Saves validate the derived links.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 10:45:28 +09:00
TakeshiandClaude Opus 5.5 826ef606df P06-03: Show Mana supply, consumption and storage; prove new-PID recovery
HUD tooltip reports world tree supply, upkeep consumption, net, stored amount
and the last boundary's shortage/overflow. A writer/reader pair saves mid-outage,
recovers in a new process and matches the writer exactly while DESTROYED and
RAIDED suspensions stay in place.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 08:59:59 +09:00
TakeshiandClaude Opus 5.5 f247d19325 P06-01: Fix review r01 findings for A06 reserve
Settle Mana raised above capacity between boundaries as recorded overflow
instead of rejecting saves or latching a fault, exclude destroyed facilities
from upkeep demand, and keep the depletion drill's outage sustained.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 20:56:57 +09:00
TakeshiandClaude Opus 5.5 65534cfd15 P06-01: Show A06 reserve capacity in HUD, add new-PID and perf evidence
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 20:29:04 +09:00
TakeshiandClaude Opus 5.5 ae0f998ff4 P06-01: Implement approved A06 finite Mana reserve (MP-01-r02 recommended)
Initial 100, capacity 300, world tree +20 per 10 game minutes. Each boundary
pays registered upkeep demand before storing surplus; overflow is discarded
and recorded, 0 stops the whole tower. Furnace offers are judged after
generation and demand payment. New saves carry mana_reserve and Operations
rollback includes it; legacy saves keep a 0..300 amount and reject others.

Outage tests that relied on Mana 0 persisting now hold the outage with a
disabled demand sink, since the world tree recovers at the next boundary.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 17:20:04 +09:00
Takeshi 39f6068461 Add supply auto-purchase and preserve save recovery state 2026-10-02 07:35:03 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi 6077e02ebe Add universal macOS release build with exported opening verification 2026-09-10 00:07:16 +09:00
Takeshi 7121092794 Fix facility discovery in exported builds and verify first construction 2026-09-09 23:59:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00
Takeshi b3b82ef03e Add business pricing and closure controls with compatible digest optimization 2026-09-09 12:04:12 +09:00
Takeshi 627b200f00 Connect paid food purchasing, kitchen production, and porter deliveries 2026-09-09 09:46:33 +09:00
Codex 29a660aed0 Enable first operating day with staff assignments, opening guide, and ledger 2026-09-09 08:26:20 +09:00
Codex 423fd6dd2e Preserve approved pixel tower prototype as development baseline 2026-09-09 07:51:16 +09:00