Commit Graph
93 Commits
Author SHA1 Message Date
Takeshi 6b40805e64 Record pure tag projection local acceptance and preserve remaining P23-02 gates 2026-10-12 07:21:51 +09:00
Takeshi 529047836f Record residual profiling and pure tag projection host build with remaining acceptance gates 2026-10-12 07:00:49 +09:00
Takeshi fd4b48b94b Record native WALK impact and whole-save equivalence with unmet performance budget 2026-10-12 06:18:11 +09:00
Takeshi 32be96ac76 Record finite native WALK equivalence and remaining P23-02 gates 2026-10-12 06:07:04 +09:00
Takeshi c67facdf48 Record native WALK provider host build and remaining P23-02 validation 2026-10-12 05:37:27 +09:00
Takeshi 8d55771647 Record P23-02 budget impact and whole-save equivalence 2026-10-12 05:03:58 +09:00
Takeshi 5055cc990b Record finite native Budget equivalence and remaining P23-02 gates 2026-10-12 04:47:42 +09:00
Takeshi 1c9ec77812 Record P23-02 native budget candidate and verified host build 2026-10-12 04:22:51 +09:00
Takeshi c34a7d3c6b Record bounded P23-02 performance-budget callback diagnostics 2026-10-12 04:09:52 +09:00
Takeshi d7b6608d0a Record P23-02 whole-save equivalence and decline unproven optimization 2026-10-12 03:56:49 +09:00
Takeshi 5516997fe1 Record P23-02 cached path equivalence and corrected candidate evidence 2026-10-12 03:39:45 +09:00
Takeshi ebf0fbe04b Record P23-02 internal diagnostics and remaining acceptance gaps 2026-10-12 03:11:40 +09:00
Takeshi 999a8b5e97 Record P23-02 local names validation and remaining acceptance gaps 2026-10-12 02:30:42 +09:00
Takeshi dc2ccccb36 Record P23-02 cache key validation and remaining acceptance gaps 2026-10-12 01:45:24 +09:00
Takeshi 89392846b7 Record P23-02 tag helper validation and candidate disposition 2026-10-12 01:01:47 +09:00
Takeshi e2d9144cca Record P23-02 travel ownership validation and whole-tick evidence 2026-10-12 00:10:49 +09:00
Takeshi 4013249135 Record P23-02 reconstruction equivalence and whole-tick disposition 2026-10-11 23:25:17 +09:00
Takeshi 3fe0b20207 Record P23-02 impact validation and reconstruction build evidence 2026-10-11 22:41:17 +09:00
Takeshi f7189923dd Record P23-02 boundary and whole-tick comparison evidence
Integrate the reviewed r195 boundary checks and r196 whole-tick comparison while retaining all unmet acceptance gates. Correct the need-relief fixture description to six zero-valued fields; no candidate adoption or additional unit completion is claimed.
2026-10-11 22:02:35 +09:00
Takeshi b9866afa02 Record P23-02 native guest pipeline validation and remaining gates 2026-10-11 21:18:49 +09:00
Takeshi 19daef97d3 Record P23-02 residual diagnostics and input structure audit 2026-10-11 20:35:41 +09:00
Takeshi 002400a080 Record P23-02 budget validation and remaining performance work 2026-10-11 20:03:41 +09:00
Takeshi fefe7d847f Record P23-02 repeated performance results and next candidate 2026-10-11 19:19:19 +09:00
Takeshi b1253fb066 Record P23-02 residual diagnostics and elevator index review 2026-10-11 18:36:44 +09:00
Takeshi a172288223 Record P23-02 cache validation and remaining performance gates 2026-10-11 18:00:49 +09:00
Takeshi 2be3b9cab9 Record P23-02 game validation and cache investigation progress 2026-10-11 17:16:46 +09:00
Takeshi d853b91b0b Record P23-02 native SDK validation and remaining acceptance gates 2026-10-11 16:37:47 +09:00
Takeshi b84bade045 Save The Tree implementation and acceptance work in progress
Preserve production code, regression fixtures, audio assets and provenance, test infrastructure, and the original-completion plan and progress ledger. Final game and Windows acceptance remain pending; excluded local artifacts and native experiments are not part of this snapshot.
2026-10-11 15:58:00 +09:00
Takeshi 39f6068461 Add supply auto-purchase and preserve save recovery state 2026-10-02 07:35:03 +09:00
Takeshi 285528b7a3 Expose pending service pricing in facility UI
Show normal usage fees separately from the unspecified desire-match surcharge. Preserve free reception and omit guest pricing from warehouse and cleaning rooms.

Validation: 155 suites / 12,310 checks; focused 700 checks; strict state and event equivalence; 16 normal and compact FRONT/BACK captures.
2026-10-01 02:43:39 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi 6077e02ebe Add universal macOS release build with exported opening verification 2026-09-10 00:07:16 +09:00
Takeshi 6aa7397c2e Track the exported opening regression script UID 2026-09-10 00:00:38 +09:00
Takeshi 7121092794 Fix facility discovery in exported builds and verify first construction 2026-09-09 23:59:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi e246ce382b Record the verified transport recovery point 2026-09-09 12:58:57 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00
Takeshi 4d72de8973 Record business policy acceptance, economy results, and recovery point 2026-09-09 12:06:29 +09:00
Takeshi b3b82ef03e Add business pricing and closure controls with compatible digest optimization 2026-09-09 12:04:12 +09:00
Takeshi 071e338e82 Record three-day supply acceptance and recovery checkpoint 2026-09-09 09:58:09 +09:00
Takeshi 627b200f00 Connect paid food purchasing, kitchen production, and porter deliveries 2026-09-09 09:46:33 +09:00
Codex 29a660aed0 Enable first operating day with staff assignments, opening guide, and ledger 2026-09-09 08:26:20 +09:00
Codex 423fd6dd2e Preserve approved pixel tower prototype as development baseline 2026-09-09 07:51:16 +09:00