Commit Graph
5 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 8917c190cf P14-02: Split warps into guest FRONT and staff BACK service warp (A08)
The FRONT Mana warp is guest-only: its connectors carry the "!staff" access,
which path access checks treat as open to everyone except staff. A new 2x2
BACK service warp links only to other service warps for staff, with A07
values. Registry and palette now hold 25 definitions.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 13:48:14 +09:00
TakeshiandClaude Opus 5.5 0cfaec1626 P14-02: Add buildable Mana warp (A07)
2x2 FRONT warp at 3000G/30 materials/360 min, 15G/day and 1 Mana upkeep.
Every completed warp pair is linked by one path connector, so crossing is a
single step; a 3-Mana fare per rider is charged once in the step's tick.
Warps close while either end is unpowered, the reserve is empty or below one
fare, and blocked arrivals offer no step. Saves validate the derived links.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 10:45:28 +09:00
TakeshiandClaude Opus 5.5 f247d19325 P06-01: Fix review r01 findings for A06 reserve
Settle Mana raised above capacity between boundaries as recorded overflow
instead of rejecting saves or latching a fault, exclude destroyed facilities
from upkeep demand, and keep the depletion drill's outage sustained.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 20:56:57 +09:00
TakeshiandClaude Opus 5.5 ae0f998ff4 P06-01: Implement approved A06 finite Mana reserve (MP-01-r02 recommended)
Initial 100, capacity 300, world tree +20 per 10 game minutes. Each boundary
pays registered upkeep demand before storing surplus; overflow is discarded
and recorded, 0 stops the whole tower. Furnace offers are judged after
generation and demand payment. New saves carry mana_reserve and Operations
rollback includes it; legacy saves keep a 0..300 amount and reject others.

Outage tests that relied on Mana 0 persisting now hold the outage with a
disabled demand sink, since the world tree recovers at the next boundary.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 17:20:04 +09:00
Takeshi b84bade045 Save The Tree implementation and acceptance work in progress
Preserve production code, regression fixtures, audio assets and provenance, test infrastructure, and the original-completion plan and progress ledger. Final game and Windows acceptance remain pending; excluded local artifacts and native experiments are not part of this snapshot.
2026-10-11 15:58:00 +09:00