Commit Graph
13 Commits
Author SHA1 Message Date
TakeshiandClaude Opus 5.5 f247d19325 P06-01: Fix review r01 findings for A06 reserve
Settle Mana raised above capacity between boundaries as recorded overflow
instead of rejecting saves or latching a fault, exclude destroyed facilities
from upkeep demand, and keep the depletion drill's outage sustained.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 20:56:57 +09:00
TakeshiandClaude Opus 5.5 65534cfd15 P06-01: Show A06 reserve capacity in HUD, add new-PID and perf evidence
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 20:29:04 +09:00
TakeshiandClaude Opus 5.5 ae0f998ff4 P06-01: Implement approved A06 finite Mana reserve (MP-01-r02 recommended)
Initial 100, capacity 300, world tree +20 per 10 game minutes. Each boundary
pays registered upkeep demand before storing surplus; overflow is discarded
and recorded, 0 stops the whole tower. Furnace offers are judged after
generation and demand payment. New saves carry mana_reserve and Operations
rollback includes it; legacy saves keep a 0..300 amount and reject others.

Outage tests that relied on Mana 0 persisting now hold the outage with a
disabled demand sink, since the world tree recovers at the next boundary.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-19 17:20:04 +09:00
Takeshi 39f6068461 Add supply auto-purchase and preserve save recovery state 2026-10-02 07:35:03 +09:00
Takeshi 5dde0c5ec2 Record original-alignment implementation and traceability checkpoint
Capture current source, content data, tests, asset licenses, and original-specification traceability. Original implementation remains incomplete. The accepted matching UI generation passed 154 suites and 12,253 checks, with eight rendered staff-contract screens reviewed. Latest native Windows and full-original acceptance remain outstanding.
2026-09-30 23:52:24 +09:00
Takeshi 6077e02ebe Add universal macOS release build with exported opening verification 2026-09-10 00:07:16 +09:00
Takeshi 7121092794 Fix facility discovery in exported builds and verify first construction 2026-09-09 23:59:24 +09:00
Takeshi fb4ad23190 Add explicit stairs and measure elevator congestion with real actors 2026-09-09 14:26:38 +09:00
Takeshi 0f12c748e9 Connect physical elevators and staff commutes to construction, saves, and cutaway UI 2026-09-09 12:58:40 +09:00
Takeshi b3b82ef03e Add business pricing and closure controls with compatible digest optimization 2026-09-09 12:04:12 +09:00
Takeshi 627b200f00 Connect paid food purchasing, kitchen production, and porter deliveries 2026-09-09 09:46:33 +09:00
Codex 29a660aed0 Enable first operating day with staff assignments, opening guide, and ledger 2026-09-09 08:26:20 +09:00
Codex 423fd6dd2e Preserve approved pixel tower prototype as development baseline 2026-09-09 07:51:16 +09:00