Files
TheTree_mock/tests/fixtures/p08-02/README.md

24 lines
1.3 KiB
Markdown

# P08-02 diagnostic fixture
Controlled fixture inputs are diagnostic, not production balance values.
Native collection and acceptance remain pending.
Seed: 42588. Registered construction costs for the 16 planned builds total
gold 7110 / materials 88; Gina signing costs 150 and eight raw food units cost
24. Initial resources are gold 5000 / materials 50. The previous fixture had
no change_resources delta (zero), short by gold 2284 / materials 38.
The fixture derives and records this deficit from the actual registry/catalogs
in identity.diagnostic_budget before using the existing change_resources command.
No price or production coefficient is changed.
Stair preparation proceeds from floor 1 through floor 3. Each pair finishes
using the maximum registered stair build_minutes before the next floor is
ordered. Ground landings use initialized world paths; upper landings are
created by completed stairs through build_facility, with a local path check
before each pair. Failed commands include kind, payload and result details.
The first legacy premium job progresses while the six actor/transport facets
are prepared. The second is paid and reserved immediately before saving, with
zero progress; the dormitory is already complete. All three stages share the
same migration batch and whole-state writer/reader comparisons.