24 lines
1.3 KiB
Markdown
24 lines
1.3 KiB
Markdown
# P08-02 diagnostic fixture
|
|
|
|
Controlled fixture inputs are diagnostic, not production balance values.
|
|
Native collection and acceptance remain pending.
|
|
|
|
Seed: 42588. Registered construction costs for the 16 planned builds total
|
|
gold 7110 / materials 88; Gina signing costs 150 and eight raw food units cost
|
|
24. Initial resources are gold 5000 / materials 50. The previous fixture had
|
|
no change_resources delta (zero), short by gold 2284 / materials 38.
|
|
The fixture derives and records this deficit from the actual registry/catalogs
|
|
in identity.diagnostic_budget before using the existing change_resources command.
|
|
No price or production coefficient is changed.
|
|
|
|
Stair preparation proceeds from floor 1 through floor 3. Each pair finishes
|
|
using the maximum registered stair build_minutes before the next floor is
|
|
ordered. Ground landings use initialized world paths; upper landings are
|
|
created by completed stairs through build_facility, with a local path check
|
|
before each pair. Failed commands include kind, payload and result details.
|
|
|
|
The first legacy premium job progresses while the six actor/transport facets
|
|
are prepared. The second is paid and reserved immediately before saving, with
|
|
zero progress; the dormitory is already complete. All three stages share the
|
|
same migration batch and whole-state writer/reader comparisons.
|