Commit Graph
7 Commits
Author SHA1 Message Date
Claude Opus 5.5 (Desktop) 34b16de279 Align the P16-01-DISMISS acceptance record with its kept record gaps
The acceptance record said every failure's raw output was kept, which
contradicts the record gaps listed right below it (the first a073ccb
derive run and the stage-only diagnostic copies). It now says the
formal test raw output and the earlier review results are kept, no
earlier S evidence is reused for the new S, and the missing original
bytes are stated in the next section. The two ledger references to the
record take its new hash; the static plan check is rewritten.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-25 18:55:36 +09:00
Claude Opus 5.5 (Desktop) 8a2ea74f44 Record the P16-01-DISMISS auxiliary acceptance and keep original P16-01 open
P16-01-DISMISS (dismissal of a general employee by the ordinary
command and the Main staff panel, with the A14 severance, held unpaid
wages, refusals R1-R9 and the cleanup at the command boundary) passed
all four normal gates: validation, review, integration and final. A
fresh separate Opus review passed F1-F10 with no high or medium
finding and five lows. S f5fe219 -> Q 4ca3bbe with the same tree; the
measurements are on S.

Original credit is 0, so the count stays 24/88 and 4/30. Original
P16-01 moves from planned to in_progress; recruitment, market and debt
acquisition and the cost per employment category remain. P16-03 stays
planned with a note. The P05 residual on the dismissal severance is
restated (A14 answered, connected, not counted as P05 completion).
The five review lows, the R9 boundary, the kept record gaps and the
Windows device acceptance are disclosed. Earlier failures and
changes_requested reviews are kept. IMPLEMENTATION_PLAN gains the
current 24-unit, feature-first section above the kept history.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-25 18:52:22 +09:00
Claude Opus 5.5 (Desktop) 0b59d7c23c Record the P07-01-WX auxiliary acceptance and keep original P07-01 open
P07-01-WX (natural weather, rain arrivals and stay, storm, world tree
and adult fog effects, HUD forecast, save and migration) passed all
four normal gates: validation, review, integration and final. A fresh
separate Opus review passed WX1-WX8 with no high or medium finding and
two lows. S db87270 -> Q 9b5b09b with the same tree; the measurements
are on S.

Original credit is 0, so the count stays 24/88 and 4/30. Original
P07-01 moves from planned to in_progress. The furnace yield 120 at fog
boundaries and AR.weather.fog_magic remain, waiting for the P13 furnace
facility, D04 and the A06 separate approval. The event-log name of the
weather event and the two review lows are disclosed. Earlier failures
and changes_requested reviews are kept.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-24 10:45:24 +09:00
Claude Opus 5.5 (Desktop) 48d3b0023b Complete original P05-02 acceptance and keep P05 residuals open
P05-02 (all expense categories and front/back funds) is formally completed:
S 8954914 -> Q cb183fd (same tree), Runner completed 8/8 with validation,
review, integration and final passed, and a separate fresh Opus PASS for
F1-F8 (high/medium 0, low 3). Measurements were taken on S; Q was
re-verified by content and is not relabelled as measured. Original
completion moves from 23 to 24 of 88; packages stay 4 of 30.

Still open: the P05 package (P05-03), ordinary-play back_gold (P09/P11
remaining_paid_role), two UI lows deferred under the feature-first
instruction, severance, Windows and whole-game acceptance. Earlier
failures and changes_requested reviews are kept.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-23 22:52:34 +09:00
Claude Opus 5.5 (Desktop) dda3eed47d Fix the P28-02-OPT registration documents (r04) for the continuing registration
The r03 S f651ce1 failed its formal OPT verification: the save sample of the migration
attempt of a rejected out_of_range load stays in K. r04 extends decision D1 to that sample,
adds only that statement to the SPEC section 2 sites and derives the fixed table again from
the before record only. Docs only; the r03 task keeps its failure.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 16:15:36 +09:00
Claude Opus 5.5 (Desktop) a916841bfc Fix the P28-02-OPT registration documents (r03) before product optimization
Docs only. Adds execution/p28-02/opt/: SPEC.md, TASK_INSTRUCTIONS.md and
registration/ (acceptance baseline of 12, registration and config
proposals, the before-derived fixed table of allowed cross-version
differences, and the byte-transfer record). Decision D1 is option B:
only the load_from_path failure path stops recording its performance
telemetry; the frozen E3 rule stays. The improvement rule is the formally
completed EQ SPEC §4. No product, frozen EQ or original-condition change;
23/88 and 4/30 unchanged. Registration is Root's; implementation is Opus.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 11:17:17 +09:00
Claude Opus 5.5 (Desktop) 44bce9177c Record formal P28-02 equivalence harness acceptance without original-unit credit
P28-02-EQ (support task) completed through the normal Runner flow:
S 9adbbee -> Q 4e34e52 on main 54e07ca. Exact-S native 7 phases,
formal unit 179 and native-verify, fresh independent Opus review of all
6 conditions (pass, low 2), normal integration and final, joined with
the actual Runner DB and traceability. The earlier changes_requested
(a46418d, EQ5) and the b2dbda8/6f75c9a failures stay preserved.
Original P28-02 remains in progress; 23/88 and 4/30 unchanged.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-22 10:15:10 +09:00